Project Mission Statement - Software Design Question and Answers

1.

What among these takes a project mission statement as its input?

   A.) Generic Software Product Design
   B.) Generic Software Engineering Design
   C.) Generic Software Product & Engineering Design
   D.) None of the mentioned

Answer: Option 'A'

Generic Software Product Design

DigitalOcean Referral Badge

2.

Which of these are known as Project mission statement?

   A.) Business case document
   B.) Project charter
   C.) Project brief
   D.) All of the mentioned

Answer: Option 'D'

All of the mentioned

DigitalOcean Referral Badge

3.

The important roles followed by the project mission statement?

   A.) Launching a development project
   B.) Stating the software design problem
   C.) Both Launching a development project & Stating the software design problem
   D.) None of the mentioned

Answer: Option 'C'

Both Launching a development project & Stating the software design problem
 

DigitalOcean Referral Badge

4.

Which of the following statement is correct?

   A.) Assumption is any factor that limits developers
   B.) Constraint is something that developers take it as granted
   C.) Constraint is a restriction on the solution
   D.) Assumption is drawback of the problem

Answer: Option 'C'

Constraint is a restriction on the solution
 

DigitalOcean Referral Badge

5.

Which of these are true for product vision and project scope?

   A.) Product vision is general description of product’s purpose and form
   B.) Project vision is work to be done in a project
   C.) Project scope is general description of product’s purpose and form
   D.) None of the mentioned

Answer: Option 'A'

Product vision is general description of product’s purpose and form

DigitalOcean Referral Badge

6.

Which among these is not a stakeholder?

   A.) Manager
   B.) Marketing person
   C.) User
   D.) Audience not a part of software who does not follow or has any concerns about software

Answer: Option 'D'

Audience not a part of software who does not follow or has any concerns about software

DigitalOcean Referral Badge

7.

Which of these steps is not in sequence with project mission statement?
i. Introduction
ii. Target Markets
iii. Product vision and scope
iv. Business requirements

   A.) i and ii
   B.) ii and iii
   C.) iii and iv
   D.) ii and iv

Answer: Option 'B'

ii and iii

DigitalOcean Referral Badge

8.

Which of these is not a part of the project mission template?

   A.) Introduction
   B.) Product vision and project scope
   C.) Business requirements
   D.) Functional requirements

Answer: Option 'D'

Functional requirements

DigitalOcean Referral Badge

9.

What is the project mission statement?

   A.) It is a document that defines development project’s goal
   B.) It is a document that specifies project’s limits
   C.) It is a document that defines development project’s goal & specifies project’s limits
   D.) It is a document which specifies project mission

Answer: Option 'C'

It is a document that defines development project’s goal & specifies project’s limits

DigitalOcean Referral Badge

10.

The design process where project mission statement is the input what will be its output?

   A.) Final design document
   B.) SRS
   C.) Product plan
   D.) Design document

Answer: Option 'B'

SRS

DigitalOcean Referral Badge

Project Mission Statement Download Pdf

Recent Posts